Guide

How to mount the Poly TC10 Touch Controller

Updated

Where and how to mount the Poly TC10 Touch Controller: supported options, placement and the mounts that fit.

How to mount the Poly TC10 Touch Controller
How to mount the Poly TC10 Touch Controller: supported options, mounts that fit, placement and cable planning.

Mounting options

Poly lists these mounting options for the TC10 Touch Controller: Wall, glass or table (stand included).

Mounts that fit the TC10 Touch Controller

Placement

  • Put it where the meeting organizer sits, usually the head or middle of the table.
  • A riser or angled mount makes it easier to read from a chair; a flat table mount keeps sightlines clear.
  • Run the cable through a table grommet, not across the table.

Running the cables

Plan the cable path before you drill: a PoE network drop is the only cable it needs. The TC10 Touch Controller connects via: Ports: 1 RJ-45.

More TC10 Touch Controller guides

Related guides

All setup guides →

Outfitting several rooms, or reselling? Get a volume quote or apply for wholesale pricing →

In this guide

Products mentioned

Get a quote